Log in
Register
Home
Forums
New posts
Search forums
What's new
Featured content
New posts
New profile posts
Latest activity
News
Members
Current visitors
New profile posts
Search profile posts
Features
Log in
Register
What's new
Search
Search titles only
By:
Search titles only
By:
New posts
Search forums
Menu
Install the app
Install
Reply to thread
Home
Forums
Low Earth Orbit
Lighting & Electrical
Event Power, problems, observances, etc.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="John Neil" data-source="post: 49068" data-attributes="member: 422"><p>Re: Event Power, problems, observances, etc.</p><p></p><p>Ian,</p><p></p><p>I spent the winter as an AV tech on a automotive training seminar "tour" for a luxury brand. Being luxury, we spent our time in Westin, Hilton, Ritz Carlton, and Grand Hyatt properties. We had a 53' trailer full, mostly projection, plasmas, and scenics. Minimal audio and event lighting. Week to week I saw massive disparities regarding accessibility, security, hospitality, local crew ability to over-under, and even...most frustrating...thermostatic control of our event ballrooms. Seriously, 70 degrees F from start to finish. 78 is not acceptable when my guests are wearing suits.</p><p></p><p>You will find that aside from catering's need to plug in warming lights for lunch, there is no standard. Many of these facilities have seen multiple facelifts since construction and each time it seems that electrical infrastructure has not made the budget. I had #2 feeder and distro setups for each of our general sessions. My feeder and distro lived in the nose of the truck and never came off. In less than 10% of the ballrooms could they even accommodate a high-current 4 or 5 wire tie-in. In that 10% the cost was prohibitive for my needs. In less than half of the ballrooms did they have a "spider box" solution. In less than half of those cases did the spider box meter safe under load. Thus, one in four cities saw me (unexpectedly) searching the venue for extra circuits of wall outlets and then meeting with the venue manager to say "we will not be paying for the spider box that according to you, works fine for everyone else." In less than 10% of the facilities visited did I talk to an electrician who met the NEC definition of a qualified person. The worst was a facility that used spider box feeds from NEMA 18-60 (three hots, neutral, no ground) where I metered 28 volts neutral to ground. Sorry guys, we're running cables down the hall this week.</p><p></p><p><img src="http://i44.tinypic.com/2ur3sye.jpg" alt="" class="fr-fic fr-dii fr-draggable " data-size="" style="" /></p><p></p><p>That's right, the upstream OCPD from that edison is a 50A three pole breaker...unless the warning label counts for something. Such a shame. Three 50A edison circuits would have been PLENTY for my needs.</p><p></p><p>I have photos where a venue electrician pulled 6/5 feeder (!!!bare ends, not even locked out at the disconnect!!!) out of a suspended ceiling and attached it to 4/4 into a distro with wire nuts. Perhaps they make wire nuts to join #4 wire, but these weren't them.</p><p></p><p>In the best of venues, I saw 100A 5 wire pin and sleeve solutions. I saw mini-cam feeder into local distros that used L21-20 breakout setups. Never a "cali" and only once did I see a 4 wire range plug.</p><p></p><p>Per my experience, hotel conference centers are divorced from hotel facility financials. The only facility upgrades that happen are those that make money for the property. I'm betting electrical never makes that list. The only times where I was able to get an accurate schematic of edison branch circuit layouts where ironically the times when I was speaking with an in-house PSAV manager who wasn't making a cent but appreciated the "week off" he was getting while I was in town.</p><p></p><p>Facility to facility, your mileage will vary. In-house A/V teams will likely be the only ones readily equipped to work with available resources. Be flexible and have your checkbook ready. Multiple elevators, doors not wide enough, pushes through kitchens, "you can't get there from here," docks too small for your semi, and electrical alphabet soup are the name of the game. Have fun.</p></blockquote><p></p>
[QUOTE="John Neil, post: 49068, member: 422"] Re: Event Power, problems, observances, etc. Ian, I spent the winter as an AV tech on a automotive training seminar "tour" for a luxury brand. Being luxury, we spent our time in Westin, Hilton, Ritz Carlton, and Grand Hyatt properties. We had a 53' trailer full, mostly projection, plasmas, and scenics. Minimal audio and event lighting. Week to week I saw massive disparities regarding accessibility, security, hospitality, local crew ability to over-under, and even...most frustrating...thermostatic control of our event ballrooms. Seriously, 70 degrees F from start to finish. 78 is not acceptable when my guests are wearing suits. You will find that aside from catering's need to plug in warming lights for lunch, there is no standard. Many of these facilities have seen multiple facelifts since construction and each time it seems that electrical infrastructure has not made the budget. I had #2 feeder and distro setups for each of our general sessions. My feeder and distro lived in the nose of the truck and never came off. In less than 10% of the ballrooms could they even accommodate a high-current 4 or 5 wire tie-in. In that 10% the cost was prohibitive for my needs. In less than half of the ballrooms did they have a "spider box" solution. In less than half of those cases did the spider box meter safe under load. Thus, one in four cities saw me (unexpectedly) searching the venue for extra circuits of wall outlets and then meeting with the venue manager to say "we will not be paying for the spider box that according to you, works fine for everyone else." In less than 10% of the facilities visited did I talk to an electrician who met the NEC definition of a qualified person. The worst was a facility that used spider box feeds from NEMA 18-60 (three hots, neutral, no ground) where I metered 28 volts neutral to ground. Sorry guys, we're running cables down the hall this week. [IMG]http://i44.tinypic.com/2ur3sye.jpg[/IMG] That's right, the upstream OCPD from that edison is a 50A three pole breaker...unless the warning label counts for something. Such a shame. Three 50A edison circuits would have been PLENTY for my needs. I have photos where a venue electrician pulled 6/5 feeder (!!!bare ends, not even locked out at the disconnect!!!) out of a suspended ceiling and attached it to 4/4 into a distro with wire nuts. Perhaps they make wire nuts to join #4 wire, but these weren't them. In the best of venues, I saw 100A 5 wire pin and sleeve solutions. I saw mini-cam feeder into local distros that used L21-20 breakout setups. Never a "cali" and only once did I see a 4 wire range plug. Per my experience, hotel conference centers are divorced from hotel facility financials. The only facility upgrades that happen are those that make money for the property. I'm betting electrical never makes that list. The only times where I was able to get an accurate schematic of edison branch circuit layouts where ironically the times when I was speaking with an in-house PSAV manager who wasn't making a cent but appreciated the "week off" he was getting while I was in town. Facility to facility, your mileage will vary. In-house A/V teams will likely be the only ones readily equipped to work with available resources. Be flexible and have your checkbook ready. Multiple elevators, doors not wide enough, pushes through kitchens, "you can't get there from here," docks too small for your semi, and electrical alphabet soup are the name of the game. Have fun. [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Low Earth Orbit
Lighting & Electrical
Event Power, problems, observances, etc.
Top
Bottom
Sign-up
or
log in
to join the discussion today!