Reply to thread

Re: Danley demo on 11/13 in Atlanta




YEAH-that was a PAIN-and scary. Kinda hard to enjoy it when you have to spend the time counteracting the swaying action of the PA-even if it was strapped together.


 I have a plan this time (I was not aware of the situation last time).


We have built a large base that will spread out the load-will bring shims to make sure it is level and the whole thing will be strapped all the way around and lagged into the base.


Plus with it being only 2 boxes tall, there will be much less "rocking" between the elements.  Last time it was 3 TH115's tall with 2 tall SH46's on top of that.