Reply to thread

Re: Danley demo on 11/13 in Atlanta



The "Danley aspect" won't need any help per say (but an extra hand or two never hurts :)), but if you are interested in showing up-maybe to learn more about what and why we are doing what we are doing, by all means come on down. 


Load in currently is 12-but Evan is trying to get it moved up a bit-to allow more time for setup.  The show is stated for 6pm (I'm not sure if that is doors or 1st band), but there are 4 bands that night-so lots of work to do in a short period of time.  Including setting up the PA-  At least it is just stacks and racks.  But the "stacking" is not "normal".  Getting a J3 on top of a TH812 is not a "normal stack".  But should be pretty easy-with what I have "rigged up".


And then we have to anchor it all together so it doesn't move around as the floor moves up and down.