Normal
Re: FREE SUB PLAN: Dual Lab12 (Front Loaded) by Welter SystemsSnapped a few photos tonight after installing the port walls, I very much feel like an alternate solution for handles is in order.[ATTACH]151966[/ATTACH][ATTACH]151967[/ATTACH][ATTACH]151968[/ATTACH]So far that extends 1" into the port, still needs to be capped off with either 1/2" or 3/4" ply.
Re: FREE SUB PLAN: Dual Lab12 (Front Loaded) by Welter Systems
Snapped a few photos tonight after installing the port walls, I very much feel like an alternate solution for handles is in order.
[ATTACH]151966[/ATTACH][ATTACH]151967[/ATTACH][ATTACH]151968[/ATTACH]
So far that extends 1" into the port, still needs to be capped off with either 1/2" or 3/4" ply.