Yes, you read that right. May 1st (Sunday) load in, May 2nd show and out. Need about 600' of truss (mostly 12", some 20" or similar) with plenty of motors, mixture of WFL par and 36 degree S4 lekos (this is flexible according to your inventory), 72+ channels of control (ETC preferred), probably double that in dimming. Also need ground row and flown for lighting their cyc. 3 sets of legs (24' or so). Main drape and traveller also if you have it. Marley floor (and subfloor) if you have them.
Need Techs too, of course. IA hands and riggers will be supplied.
It'll be worth your while if you are close enough. Contact me ASAP if you can do it (or know of a good lead.)
Thanks!
Need Techs too, of course. IA hands and riggers will be supplied.
It'll be worth your while if you are close enough. Contact me ASAP if you can do it (or know of a good lead.)
Thanks!