Log in
Register
Home
Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
News
Members
Current visitors
New profile posts
Search profile posts
Features
Log in
Register
Search
Search titles only
By:
Search titles only
By:
New posts
Search forums
Menu
Install the app
Install
Reply to thread
Home
Forums
Off Topic
The Basement
Super Bowl XLVII
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Nick Pires" data-source="post: 80241" data-attributes="member: 1567"><p>Re: Super Bowl XLVII</p><p></p><p>Official word from the building's management company:</p><p>"Shortly after the beginning of the second half of the Super Bowl in the Mercedes-Benz Superdome, a piece of equipment that is designed to monitor electrical load sensed an abnormality in the system. Once the issue was detected, the sensing equipment operated as designed and opened a breaker, causing power to be partially cut to the Superdome in order to isolate the issue. Backup generators kicked in immediately as designed. Entergy and SMG subsequently coordinated start up procedures, ensuring that full power was safely restored to the Superdome. The fault-sensing equipment activated where the Superdome equipment intersects with Entergy’s feed into the facility. There were no additional issues detected."</p></blockquote><p></p>
[QUOTE="Nick Pires, post: 80241, member: 1567"] Re: Super Bowl XLVII Official word from the building's management company: "Shortly after the beginning of the second half of the Super Bowl in the Mercedes-Benz Superdome, a piece of equipment that is designed to monitor electrical load sensed an abnormality in the system. Once the issue was detected, the sensing equipment operated as designed and opened a breaker, causing power to be partially cut to the Superdome in order to isolate the issue. Backup generators kicked in immediately as designed. Entergy and SMG subsequently coordinated start up procedures, ensuring that full power was safely restored to the Superdome. The fault-sensing equipment activated where the Superdome equipment intersects with Entergy’s feed into the facility. There were no additional issues detected." [/QUOTE]
Insert quotes…
Verification
Post reply
Home
Forums
Off Topic
The Basement
Super Bowl XLVII
Top
Bottom
Sign-up
or
log in
to join the discussion today!