Nice Job!
Halftime Show by the numbers...
24 Cameras
5 Chapman Sideline Carts
2 Jibs
2 Steadi-Cams
1 Helicopter
90 26k Projectors
384 LED Tiles
582 Feet of Blades
765 Lighting Instruments
8 D3 Servers
10 Flame Cannons & A Lot of Pyro
25,000 amps of Power
1/2 Mile of Truss
18 Audio Field Carts w/ 108 Speakers
24 Stage Carts
1 24' Long x 12' High Lion Puppet
1 18,000 Square Foot Projection Surface
48 Golf Carts
1 Flying by Foy Rig
More than 850 Costumes
24,000 Sq Feet of Tenting
145,000 Flashlights
1,000 FM Radios
600 LED Orbs
11 12' Long x 6' Cloud Balloons
3,650 Hotel Room Nights
1,366 Pizzas
7,620 Boxed Lunches
...and most importantly
750 Cast members
480 Field Team Members
400 Staff & Crew
Without their dedication and talent there would be no Halftime Show.
A sincere thank you to everyone involved
Halftime Show by the numbers...
24 Cameras
5 Chapman Sideline Carts
2 Jibs
2 Steadi-Cams
1 Helicopter
90 26k Projectors
384 LED Tiles
582 Feet of Blades
765 Lighting Instruments
8 D3 Servers
10 Flame Cannons & A Lot of Pyro
25,000 amps of Power
1/2 Mile of Truss
18 Audio Field Carts w/ 108 Speakers
24 Stage Carts
1 24' Long x 12' High Lion Puppet
1 18,000 Square Foot Projection Surface
48 Golf Carts
1 Flying by Foy Rig
More than 850 Costumes
24,000 Sq Feet of Tenting
145,000 Flashlights
1,000 FM Radios
600 LED Orbs
11 12' Long x 6' Cloud Balloons
3,650 Hotel Room Nights
1,366 Pizzas
7,620 Boxed Lunches
...and most importantly
750 Cast members
480 Field Team Members
400 Staff & Crew
Without their dedication and talent there would be no Halftime Show.
A sincere thank you to everyone involved