Looking for a general A/V Tech for Set/Strike in Greensboro, NC.
Load in at 10a
Load out at 10p
Should take about 4 hours on the in and 2 hours on the out.
Thanks
-will
Load in at 10a
Load out at 10p
Should take about 4 hours on the in and 2 hours on the out.
Thanks
-will